Photo Log Book
Scanning the propeller, Stabilizer & Final Rib 

- Page 11

David, of Cimtec in Algona, scans Museum of Flight’s original Douglas World Cruiser propeller for the reproduction of the Seattle II World Cruiser.

 

Scanner wand

 
 

Reflective Target Dots


 

Propeller prepared for Scanning

 
 

Checking the Scan


 

Finishing with the Tip

 
 

Scanned before going back to the lab, and final adjustments


 

Horizontal Stabilizer, coming from the Sorrell shop.  John showing his beautiful artistic workmanship.

 

 
 

The Final Ring Rib, #248, October 3, 2008.  Left to Right: Hank Hendrickson, Lee Sanislo, Keith Murphy, Fred Hazelton